GE WenTao, GONG ChunHui, LIU Zhou, et al. LOAD EXTRACTION OF LEAF-SPRING BUSHING BASED ON ROAD LOAD DATA AND TEST-RIG FATIGUE TEST[J]. 2020,42(1):43-49.
GE WenTao, GONG ChunHui, LIU Zhou, et al. LOAD EXTRACTION OF LEAF-SPRING BUSHING BASED ON ROAD LOAD DATA AND TEST-RIG FATIGUE TEST[J]. 2020,42(1):43-49. DOI: 10.16579/j.issn.1001.9669.2020.01.007.
In order to validate the durability attribution of leaf-spring rubber bushing fast and effectively,with the inputs of six-component force from proving ground,and taking rear suspension multi-body model as a carrier,based on the road load data,by applying virtual iteration technique,the dynamic load of bushing has been extracted. In order to keep the connection between the test-rig and the road of proving ground,according to equivalent damage theory,the fatigue test procedure of test-rig has been draw up by using multi-block fatigue load method,and the time consuming of test-rig has been shortened,and acceleration factor of 5. 03 was achieved by comparing the test time of test-rig and proving ground,the bushing has ultimately passed the durability validation of test-rig.
关键词
板簧衬套虚拟迭代动态载荷变载荷序列法台架疲劳试验
Keywords
Leaf-spring bushingVirtual iterationDynamic loadMulti-block fatigue loadTest-rig fatigue test